Maximized Results, Minimized Costs
Wood Mackenzie estimates that 70% of the nameplate capacity of the existing deepwater GOM facilities will be available by 2017. This bodes well for Deep Gulf’s business plan and provides a board area to search for new opportunities.
-
Don Larsen
Don Larsen EB 598 #2 is operated by Anadarko Petroleum and flows in a looped flowline system tied back to Boomvang spar. Don Larsen is an oil well that came on production in October of 2007.
East Breaks Block 598Anadarko3212' -
Gladden
The Gladden Field is operated by W&T Offshore and flows in a single flowline system tied back to Murphy’s Medusa Spar. Production commenced in February 2011.
Key Facts: Area: Mississippi Canyon Block 800 Operator: W&T Water Depth: 3100' Working Interest: 20.00% (DGE I) ...Mississippi Canyon Block 800W&T3100' -
Nancy
The Nancy Field is operated by Apache Corporation and flows in a single flowline system tied back to Genesis’ GB 72 platform. Nancy is a single gas well that produces wet gas with associated condensate. Production commenced in February of 2014.
Key Facts: Area: Garden Banks Blocks 462/463 Operator: Apache Corporation Water Depth: 2400' Working Interests: 5.0% (DGE I) 10.00% (DGE II) ...Garden Banks Blocks 462/463Apache Corporation2400' -
Danny
The Danny Field is a one well subsea tieback in Garden Banks, Block 506 that is operated by Talos Energy and flows in a single flowline system tied back to the East Cameron 381 platform. Production commenced in February 2010.
Key Facts: Area: Garden Banks Block 506 Operator: Talos Water Depth: 2431' Working Interests: 10.0% (DGE I) 20.00% (DGE II) ...Garden Banks Block 506Talos2431' -
Sargent
The Sargent Field is operated by DGE I and flows in a single flowline system tied back to Genesis’ GB 72 platform. Production commenced in March 2010.
Key Facts: Area: Garden Banks Block 339 Operator: Deep Gulf Energy LP Water Depth: 1217' Working Interest: 25.00% (DGE I) 25.00% (DGE II) ...Garden Banks Block 339Deep Gulf Energy LP1217' -
Kodiak Project
The Kodiak Field was originally discovered by BP and partners in 2008. The discovery well logged over 400 net feet of Middle and Lower Miocene oil pay. An appraisal well was drilled in 2009 that delineated the field. DGE II bought BP’s working interest in the field in 2012. Subsequently DGE II farmed-in the interest of another existing leaseholder and then...
Mississippi Canyon Blocks 727 & 771Deep Gulf Energy ll4833' -
Marmalard Project
The Marmalard Field was discovered in 2012 by a well that was operated by LLOG. To date, four wells have been successfully drilled and completed in multiple middle Miocene pay sands. The wells are tied into a subsea manifold located in MC 300 which is tied back to the Delta House FPS with dual flow lines. The field...
Mississippi Canyon Blocks 255, 256, 300, 301 and 344LLOG5746' - 6131' -
Son of Bluto 2
The Son of Bluto 2 Field was discovered in 2012 in Mississippi Canyon 431. The discovery well encountered pay in two middle Miocene zones. The well was completed and began production in 2015. A second well may be drilled pending reservoir performance. The well is tied back to the Delta House FPS with dual flow lines.
Key Facts: Location: Mississippi...Mississippi Canyon Blocks 431LLOG6424'